News
NEWS
金沙所有游戏网站--责任有限公司
The second half of the decisive battle, Rongxin raw material factory earnestly answer good half year volume, tight string full bow and then start!

Stop the boat for a moment, a thousand sails have passed; Ten thousand horses contend and gallop without danger. In the first half of the year, the raw material factory of Hebei Rongxin Iron and Steel Co., Ltd. anchored the various business indicators set at the beginning of the year, carried forward the spirit of grab, create, compete, fight, and busy production, improve quality, reduce costs, grab progress, and increase the power to achieve the "double half" time task.

In the first half of the year, the raw material plant of Hebei Rongxin Iron and Steel Co., Ltd. was oriented by the demand of iron making and committed to the production of high-quality white ash, fine pellets and sinter to ensure the stable and smooth behavior of blast furnaces, and made great breakthroughs in quality and indicators. In the sintering process, the qualified rate of sinter alkalinity reached 82.96%, exceeding the plan by 2.96%, and the drum index reached 74.34%, exceeding the plan by 0.34%. In the shaft furnace process, the shaft furnace drum index completed 92.57% and 93.56%, respectively, exceeding the company's plan by 2.57% and 3.56%; In the white ash process, the white ash activity of sleeve kiln completed 300.74, 20.74 higher than the plan, and the white ash activity of double-chamber kiln completed 306.41, 6.41 higher than the plan.

Make a good "golden abacus", live a good "tight day". Raw material factory adhere to the "real gold and silver on the hero", reduce costs in innovation, in the fingers to cut benefits, to achieve multi-path tapping potential to reduce costs. We will further tap the potential of cost reduction and efficiency increase by carrying out repair, strengthening independent maintenance, and strengthening innovation and efficiency, and promote the implementation of the maximum potential with greater determination and stronger efforts. The use of self-breaking limestone waste instead of limestone powder for sintering, with a half-year profit of 2.1331 million yuan; In the research of sintering with printing powder, the production test of increasing printing powder was carried out in sintering materials. Under the premise of ensuring the forward running of blast furnace, the maximum cost was reduced by adding printing powder, and the effect was 6.923,300 yuan. From January to May, the burn up ratio of sintering was reduced by 0.05 kg, and the effect was 106,200 yuan. In June, the burn up of sintering was reduced by 1.03 kg compared with the plan, and the efficiency was 433,000 yuan. Gas consumption is 7.49 li lower than the plan, and the efficiency is 281,300 yuan. Through the improvement and innovation of various measures and means, the total efficiency of the raw material factory has been 18.1531 million yuan since the half year.

To ensure the normal operation of each equipment and reduce the failure rate of equipment is the key to achieve phased business results. Establish the awareness of all staff to care for and protect the equipment, refine the operation of the equipment, do not allow sick work, and do routine inspection work to ensure stable operation of the equipment. In order to keep the mechanical parts of each unit in good working condition during operation, extend its service life, and ensure normal production, the raw material factory strengthens spot inspection, strictly implements the five sets of lubrication, at the same time, combined with the actual situation of climate, adhere to the special weather patrol, and urge the inspectors to establish the idea of today's work, today's work, and day's clear day's high, small things as big things. In accordance with the principle of three not let go of the accident to deal with it, to eliminate it in the bud. Communicate with the post in time during the inspection, understand the operating status and control status of the equipment, carefully review the operating records of the equipment, so that they are familiar with the performance of each equipment, master the key parts of each equipment prone to problems and the solution to the problem. In order to improve the quality of employees and improve the maintenance standards, the Equipment section of the Raw Materials Plant organized a total of 700 training sessions from January to June 2024, with a total of 1,304 personnel trained, and greatly improved the level of equipment operation and maintenance through training employees. The point inspection station organized the re-combing and revision of the controlled points of key equipment in the whole plant, and after the revision, there were 370 sets of key equipment and 3496 controlled points.

Safety and environmental protection is the lifeline of enterprise development, in order to further do a good job of safety and environmental protection work, raw material factory safety and environmental protection in an overwhelming position, to promote the implementation of safety production work, landing, fall fine, the year of minor injuries more than zero accidents, no safety production responsibility accidents.

In order to fully create a learning team, the raw material factory continues to carry out skills training in the form of "point-to-point", "point-to-point", "transmission, help, and belt", combining theoretical knowledge with on-site practice, so that employees continue to consolidate the process and principle in practice, effectively improve professional skills, and then promote the safety production work of the branch plant steadily forward. A total of 13 safety education and training sessions were organized, with a total of 1131 people trained; Organized the training and examination of "Major Accident Hidden Danger Judgment" for team leaders and above, with 74 participants; Prepare and issue safety cards, organize learning by pre-shift meeting, and revise the safety operation procedures of eight posts; Organize 57 emergency rescue drills for on-site treatment of safety accidents, including gas poisoning emergency drills, fire emergency drills and belt strangulation emergency drills.

All the cadres and staff of the raw material factory fully understand the importance of environmental protection work, adhere to the implementation of target management, pay close attention to implementation, truly put environmental awareness in mind, grasp the environmental protection work in hand, carry the environmental responsibility on the shoulder, regularly hold work meetings, compacting work responsibilities, and form a work pattern of concerted efforts and co-governance. We will put environmental protection in a more prominent position. Normalize the investigation of environmental problems, sort out existing problems in a timely manner, wall map operations, adopt "checklist" closed-loop management, clarify the completion time limit, and implement the responsibility to people and specific things. The maintenance of environmental protection equipment and facilities, respectively, the sintering desulfurization static electricity, shaft furnace desulfurization static electricity, sintering machine tail dust removal, sintering loading dust removal, sintering screening dust removal, shaft furnace finished dust removal and other environmental protection facilities point maintenance; Replanting green belts, cleaning warning signs, environmental protection work does not leave dead corners, do not leave blind areas.

When sailing, take advantage of the momentum to develop a new chapter. Hebei Rongxin Iron and Steel Co., Ltd. raw material factory will continue to uphold the attitude of excellence, do all the way forward, steady forward, with high morale, pragmatic style, to achieve the annual goal and make unremitting efforts. All Xinda people should also strengthen their confidence, make persistent efforts, gather their strength, twist into a rope, riveting, and go all out to sprint the annual target tasks on the basis of achieving "double half", and constantly promote the high-quality sustainable development of the group!